Jacques Cartier Bridge | Partial closure of the multipurpose path, on November 12, from 10 p.m. to 5 a.m.
November 12, 2024 Active mobility

The Jacques Cartier and Champlain Bridges Incorporated (JCCBI) wishes to advise active mobility users that work is required to restore the bridge’s illumination system. This work will involve a partial closure of the multipurpose path:

From Tuesday, November 12, 10 p.m. to Wednesday, November 13, 5 a.m.:

  • Closure of the multipurpose path between Montreal and the Pavillon de l’île Sainte-Hélène.
  • From Montreal: users are invited to take the sidewalk from Montreal to the Pavillon de l’île Sainte-Hélène, then the tunnel under the lanes to get to the side of the multipurpose path and continue on the path to Longueuil.
  • From Longueuil: users are invited to take the multipurpose path to the Pavillon de l’île Sainte-Hélène, then the tunnel under the lanes to the sidewalk and continue on the sidewalk to Montreal.
  • The entire sidewalk remains open.
Any questions?
Contact us Subscribe to alerts
Consult the Live Traffic

Plan your travel.

 • In-progress road closures or
    obstructions
 • Cameras
 • 14-day work schedule

Go to top